Whether it is a new house, an extension or a renovation, the building permit application is submitted to the municipality with a complete file. Many delays, however, start earlier: a constraint discovered too late, or a design that has to be redrawn.

1. Check what the zoning plan allows

The municipal zoning plan (piano regolatore) sets out what can be built on the plot: zone, density, heights and distances. It pays to check it before drawing anything, so the design starts within the right limits.

2. Start from an accurate survey

For an existing building you need precise measurements of what is there today. A good survey avoids surprises on site and lets you calculate areas and volumes without errors.

3. Clarify budget, timing and subsidies

The design has to fit the budget. If there is energy-related work, some subsidies must be requested before work begins: best to think about it while preparing the application.

4. Prepare a complete file

A complete, clear file saves everyone time. It usually includes: